What do we do? - Earthquake Reconstruction
As far
as building reconstruction housing is considered SEWA will be covering 161 villages
in the three districts Kutch, Surendranagar and Patan. The total number of
completely damaged houses in these 161 villages in three districts is around 16,000. The
no.of houses, that have been severely damaged, and which are inhabitable is 12,000.
Totally around 28,000 houses will have to be rebuilt in 161 villages.
Out of the 161 villages in three
districts, SEWA will give priority to selection of villages based on:
villages where the complete village
all the houses have collapsed will be given the first preference.
where SEWA has a strong base.
the villages where the partial houses have
collapsed and partially damaged will be covered in second round.
The district associations have based on
the above criteria identified the villages. Initially SEWA will select 10 villages in each
district. Totally 30 villages will be covered and 8,000 houses will have to be rebuilt by
June 2001.

Plan of Action
The entire housing reconstruction
programme will be participatory and owner driven. There are 10 major communities in these
3 districts. Each community has its own housing design and style. The major communities
are:
SEWAs qualified team of engineers
from the Mahila Housing Trust, in consultation with the above communities, will develop
community-specific housing models. The technical aspects, along with the mud and concrete
building material will be taken into consideration.
The draft model will be finalised in consultation with expert panel of architects and
engineers.
Meanwhile SEWAs district associations
field teams who have undergone orientation will conduct "Sandesh Yatras" in the
selected 30 villages. The main objective of "Sandesh Yatra" is to orient the
villagers on safety and scientific building practices.
The "Sandesh Yatras" will be
followed by Gram Sabhas in each of the 30 villages. It has to be ensured that the entire
village attends and participates in the Gram Sabha. In the Gram Sabha:
The entire work plan and methodology will
be discussed.
The need and importance for total and
integrated village planning will be discussed.
Identify the possible areas and aspects for
the reuse of the debris.
Formulate the village committee,
representative of the entire village, with atleast 50% women.
Discuss the restoration of heritage
monuments. How to preserve the village heritage.
Prepare the village plan involving
the village as a whole, using participatory methods and livelihood.
Therefore, the villages will also plan
revival of wasteland, developing fodder farms, reviving and maintaining water resources,
village roads, community and demonstration centers.

Prepare the time plan for different stages
of implementation.
Identify the phases of implementation.
Removal of debris.
Assess and ascertain availability of water,
identify local masons and their rates.
Procurement of construction material.
The district association field teams have
considerable experience in participatory planning, however, will have to be oriented on
technical aspects of village planning.
Finalise the village plans. Prepare the
plans, cost estimates. Facilitate the village committees in getting the plans and cost
estimates approved by the Government Facilitate in procurement of construction material.
Meanwhile, the Mahila Housing Trust, will
initiate trainings for masons, in all the districts. The trainees will be identified from
the "Sandesh Yatra" meetings. Hence, by the time the village
plans get finalised, the masons will also be trained.
Meanwhile, removal of debris will alos be initiated as livelihood support, after the
reusable material is retrieved.

SEWA will design a composite unit of 200
sq.ft, with one room, kitchen, toilet and roof rain water harvesting structure.