Initiative Objectives

The primary objectives of the initiative were:

  • To analyze the availability of existing national and international sources of housing finance for the poor and report on the current status of housing finance flows to the poor.

  • To review and make recommendations on housing finance needs, as well as on support systems and services necessary for communities and households to maximize access to and utilization of housing loans.

  • To develop an integrated working system for housing micro-finance at the grassroots level that would be capable of replication throughout the country.

  • To undertake an analysis of barriers to accessing funding for housing and develop recommendations for overcoming them.

 

Initiative Activities

The primary activities undertaken within the initiative were as follows:

  1. Study on "Housing Finance and Support Needs of Women in Rural Areas".

  2. Study on "National and International Sources of Housing Finance".

  3. Study on "Performance Rating of Selected Government Schemes".

  4. Project partner workshop to present the findings of the studies and develop a housing finance and technical support model.

  5. Final development of an integrated housing finance system; full implementation of the system on a pilot basis in one rural district and partial implementation in two additional districts.

  6. Development of housing finance and technical needs related training modules; delivery of training program in three rural district level federations to coincide with pilot.

  7. Development and training in computerization of housing loan related data at three rural district level federations.

  8. End-of-initiative workshop to share findings and recommendations.

Top

 

Outcome

  • MHT has successfully developed and implemented a housing finance model. A summary of this model is provided. The model is currently being used to varying degrees in three districts, and the feedback on the approach has been very positive. A comprehensive operations manual has been developed and outlines the steps, processes and documentation that is required to make the model operational. This model could easily be replicated throughout India. Other districts in SEWA’s network have already expressed an interest in the system, and have requested the accompanying documentation and training that is required.

  • An accompanying training program has been developed and tested. It includes training modules, visual guides, training manuals, facilitators’ guides, etc., designed to increase the capacity and knowledge of implementing agencies so that they can operationalize the new system effectively. These documents could be readily adapted and duplicated for other organizations.

  • A customized FoxPro database program to record housing loans as well as savings and credit transactions was developed by MHT. It has been used successfully in the implementation of the pilot, and can be easily replicated.

  • Results in the pilot target areas include:

  • Increased demand for housing loans;

  • Increased demand for housing loan staff and housing spearhead team members;

  • Increased disbursal of housing loans in pilot district of Kheda (which was unaffected by drought);

  • Higher loan repayment rates in district of Kheda.

  • HUDCO has earmarked Rs. 100 crores for MFIs.

  • A Project Implementation Unit (PMI) has been established within HUDCO exclusively for MFI lending.

  • An internal report on bottlenecks in MFI lending has been completed by HUDCO.

Top

 

Lessons Learned

A number of valuable lessons have been learned during the implementation of this initiative:

With respect to housing loans:

  • There is a very high demand for housing loans from poor women in the informal sector.

  • Greater flexibility in loan conditions (amount, interest rate, repayment period) is a major demand/requirement for loans of this nature.

  • To ensure timely repayment of housing loans, a rigorous site based loan appraisal system is essential.

  • Informal sector poor women can and do repay housing loans.

With respect to implementing the pilot system:

  • Effective field workers are vital for financial sustainability at federation level; it is therefore necessary to develop a specialized housing finance team.

  • In order to extend housing finance to the poor, technical and financial support is needed simultaneously.

  • A simple, user-friendly software with clear prompts and few opportunities for error is much more effective than a more sophisticated one (given the existing capacity at the federation level).

  • Even with a simple system, it is necessary to provide intensive technical support and training during the initial stages of computerization.

With respect to related training:

  • Training programs at the district level are most effective when they are delivered in Gujarati (rather than Hindu or another language).

  • Participatory approaches and methodologies are much more effective than the lecture method.

Side-by-side, on-site field training is more effective than classroom training only.